Coke Oven — Composite Repair Case Study

Coke Oven Composite System

Problem: A customer at a coke plant has a 42” Coke Oven Gas Main that was experiencing <75% wall loss in the vapor space of the main due to high volume ammonia. There were…

Floor Restoration — Coatings Case Study

Floor Restoration With Coating

Problem: An industrial manufacturing plant experienced significant wear and tear on its facility’s walls and floors, leading to cracks and surface degradation. To maintain operational efficiency and safety…