Persistent Leak Resolution — Composite Repair Case Study

Problem: RAK received a call about a critical active leak on a drip leg after multiple conventional repair attempts failed, allowing the leak to persist, spread, and increase operational concern.
Reducer Leak Repair and Reinforcement — Composite Repair Case Study

Problem: A 32” to 20” reducer on a service water line was identified to have a small leak at the 9 o’clock position. The operating pressure of the system was 30 psi. The leak…
Carbon Fiber Reinforcement — Composite Repair Case Study

Problem: A critical pipeline experienced a failure necessitating immediate repair. After RAK’s team removed the old skinner clamp and thoroughly cleaned the pipe, they discovered the pipe’s condition was deteriorated…
Coke Oven — Composite Repair Case Study

Problem: A customer at a coke plant has a 42” Coke Oven Gas Main that was experiencing <75% wall loss in the vapor space of the main due to high volume ammonia. There were…
High-Pressure Steam Leak — Live Line Repair Case Study

Problem: RAK Industrial Services received an urgent call regarding a potentially hazardous situation: an active high-pressure steam leak in the steam header at a client’s warehouse. The steam leak posed significant…
Critical Tank Leak Repair — Live Line Repair Case Study

Problem: RAK was contacted by a customer with a critical need for a tank repair due to leakage issues. The leaks were impacting operations and potentially causing environmental concerns…
Unit Hole Repair and Efficiency Restoration — Composite Repair Case Study

Problem: RAK received a service request from a customer regarding a significant hole on the side of a blower unit. The hole compromised the blower’s structural integrity and operational efficiency…
AC Cooling Line Leak Repair and Restoration — Live Line Repair Case Study

Problem: RAK received an urgent request from a customer to repair an active leak on an AC cooling line. The plant needed a swift and effective repair to minimize downtime and avoid compromising the AC…
Floor Restoration — Coatings Case Study

Problem: An industrial manufacturing plant experienced significant wear and tear on its facility’s walls and floors, leading to cracks and surface degradation. To maintain operational efficiency and safety…
Gas Leak Repair and Carbon Fiber Reinforcement Case Study

Problem: RAK received a call from a customer regarding multiple gas leaks that posed safety risks and needed to be addressed immediately to avoid downtime. The pipe had old, deteriorating brackets…