The Problem
A Midwest paper mill called RAK out on an emergency basis for leaks on a fire water line in its utility tunnel. During the walk-down, the crew identified three priority leak areas on the line. One of those areas sat under an older clamp, and blasting that section did not reveal a single definitive leak source. Beyond the three priority areas, the plant identified six or more additional sections of the same line it wants wrapped.
The Solution
RAK prepared each of the three leak areas, sealed the active leaks and reinforced the damaged sections. At the third area, the crew reinstalled the existing clamp and built it into the repair. After the line was brought back to normal operation, the crew returned to seal the remaining seepage at the second and third areas. All three areas were finished with a protective top coat, and each leak was verified stopped.