Multiple Active Leaks Across Deteriorated Process Piping
Approximately 43 feet of connected large-diameter piping had extensive corrosion, severe pitting, surface deterioration, and multiple active leaks. Our team repaired the leaks, prepared the piping with low-pressure abrasive blasting, and installed a multi-layer carbon fiber system around complex connections and obstructions to restore structural integrity and provide a 20+ year life expectancy.