Confined Space Pipe Reinforcement in Flooded Vault
RAK repaired a deteriorated 24-inch process line inside a flooded vault by draining the area, preparing the surface, and applying a layered fiberglass and carbon fiber composite system. The repair restored and exceeded the pipe’s original strength, fully sealing the line and providing long-term reliability in a harsh, confined environment.